Biological settling ponds are a practicable approach for treating super-intensive shrimp aquaculture wastewater for almost all shrimp producers in the Vietnamese Mekong Delta (VMD). The optimization of the hydraulic retention time (HRT) of biological settling ponds plays a crucial role in establishing the stability of outflow wastewater quality and suitability of the settling pond area (SPA). This study aims to suggest appropriate HRT and SPA for super-intensive shrimp wastewater treatment systems based on the National Standard (QCVN 02-19:2014/BNNPTNT) and the best aqua-culture practices (BAP) standards and guidelines. We investigated 20 typical super-intensive shrimp farms in the VMD and collected effluent samples from siphoning process, daily water exchange, and outflow of biological effluent-treatment settling ponds. The results showed that the average of each super-intensive shrimp farm produced wastewater at approximately 218 m3 ha−1 day−1. The contam-inant loads of TSS, COD, TKN, and TP were commensurate to 177, 113, 9.86, and 4.19 m3 ha−1 day−1, respectively. Based on the relationship between outflow COD, TSS concentrations, and HRT of biological-surveyed settling ponds, a 13.4-day HRT and 1934-m2 SPA were suggested to optimize the super-intensive shrimp wastewater treatment systems. Our recommendation for further work is to continuously optimize the HRT and SPA rates of functional ponds (anaerobic, facultative, and maturation) to ameliorate the engineering configuration of the recommended biological settling pond
Tạp chí khoa học Trường Đại học Cần Thơ
Lầu 4, Nhà Điều Hành, Khu II, đường 3/2, P. Xuân Khánh, Q. Ninh Kiều, TP. Cần Thơ
Điện thoại: (0292) 3 872 157; Email: tapchidhct@ctu.edu.vn
Chương trình chạy tốt nhất trên trình duyệt IE 9+ & FF 16+, độ phân giải màn hình 1024x768 trở lên